Similar Posts
BIM Managers – Who is best placed to take the lead?
In order to realise the benefits from BIM during the scheme design, detailed design, construction and operation and maintenance of a project, should an independent BIM Manager be appointed?
Is there a shortage of competent BIM Managers? Do we provide enough training?
Ir. Ronan Collins, was invited by Construction IT Alliance (CITA) as Keynote Speaker to share his BIM Manager and structural engineering knowledge and skills, leadership experience, management stories, and tried and tested BIM processes at…
Clash Analysis – BIM for Multi-Discipline Coordination
When you use multiple 3D files from different consultants or for different disciplines, the BIM models for each discipline can be crossed checked for clashes in accordance with a clash detection matrix. We use Navisworks…
3 Reasons Why BIM improves Airport Baggage Handling Systems design
Are you designing a new airport, retrofitting an existing terminal or upgrading an existing airport baggage conveyance system? We have identified 3 reasons why You should use BIM to deliver a coordinated BHS design.
5 Steps to make BIM to FM Successful
The successful use of the information in BIM, produced during design and construction, for facilities management or asset management is a substantial challenge. In my experience, there are 5 requirements which must be met before…
Lessons Learned – 5 Critically important tasks you must always get right as a BIM Manager
Our team have learned many valuable lessons. Some of them we have learned through trial and error, some from failures of particular processes or strategies and most from practical implementation experience.